Seward Wyon has completed the full refurbishment
of 3 Stothert & Pitt Dockside Cranes, for Mersey Docks and
Harbour Company
 |
Replacement of damaged or
corroded boom lacings. |
 |
Replacement of ladders, platforms
and damaged structural members. |
 |
Replacement of electrical
control systems and wiring. |
 |
Relining and roofing of cab
and machine house. |
 |
Installation of safe load
indicator systems. |
 |
Overhaul of drives, gearboxes,
brakes, hydraulic systems and travel bogies. |
 |
Replacement of worn wire ropes,
Retesting and certification. |
 |
Repainting. |
In addition many crane condition surveys have been carried out,
both in the UK and overseas, some of which resulted in executing
the work to bring the cranes up to an operating condition. |